|
|
| Name: E-Day Preparation Size: 740k Type: JPG Posted By: Clayton
|
| This is the rover being test driven for the first time on the day before E-Day.
| |
|
| Name: Late Night Size: 823k Type: JPG Posted By: Clayton
|
| Adding last minute modifications and cleanup to the rover, the night before E-Day
| |
|
| Name: Late Night (Cont.) Size: 804k Type: JPG Posted By: Clayton
|
| Continuing to cleanup and rearrange wires
| |
|
| Name: Chassis Team Hiding Wires Size: 879k Type: JPG Posted By: Clayton
|
| Chassis team starts to hide wires and rearrange the chassis
| |
|
| Name: E-Day Size: 702k Type: JPG Posted By: Clayton
|
| Rover is prepared and unveiled for E-Day. Mohammed begins to make sure that everything is secure.
| |
| |